National Association of Railroad Timetable Collectors


> Introduction > Railroad Catalog > Mauch Chunk [Summit Hill and] Switch-Back RR

Mauch Chunk [Summit Hill and] Switch-Back RR

Mule powered Opened in 1827 to 1846, abandoned in 1937.(LCandN to 1874, CNJ 1874-1929)


Copyright © NAOTC 2025 - All Rights Reserved -